Skip to content

Kitchen Exhaust System Design, Fabrication & Installation— done commercially.

Kitchen Exhaust System Design, Fabrication & Installation

Design, fabrication and installation of kitchen exhaust ductwork for new and existing commercial kitchens.

Duct Clean Co. designs, fabricates and installs kitchen exhaust ductwork for commercial kitchens across India — for new fit-outs, system extensions and replacement of unsuitable ducting. Every engagement starts with a site assessment, is engineered to your cooking load and building constraints, and closes with agreed checks and a documented handover.

DCC technician in branded uniform and hard hat installing kitchen exhaust ductwork above a stainless steel canopy in a commercial kitchen
A

The system problem

What is actually happening inside.

A commercial kitchen cannot open, extend or run safely on a poorly designed or deteriorating exhaust path. Undersized runs, wrong materials and missing access lead to heat, smoke spillage, grease build-up and failed inspections.

Replacement and retrofit work in a live building brings its own constraints — the new ducting has to route through existing structure and tie into existing hoods and fans without stopping operations for longer than agreed.

01A working exhaust path

Correct layout, sizing and fabrication mean the kitchen actually clears heat, smoke and grease-laden air — not just on day one, but over years of service.

02Fit-outs and retrofits

New installations and replacement ducting are engineered around your building and equipment, with the route, access and connections planned before fabrication begins.

03A clean handover

Agreed checks and project documentation at completion give your project, facilities and compliance teams a record of what was installed and verified.

B

The DCC approach

Engineered around your operations.

We assess the site and your cooking load first, then design the exhaust layout, fabricate the ductwork and install it to the agreed scope. Hoods, duct runs, exhaust fans and related connections are included where they form part of the proposal. New installations and retrofit requirements are both handled, with checks agreed before handover.

Survey → Plan → Execute → Verify → Handover

B1 — Survey & inspection

  • 01Site assessment and requirement gathering with your team
  • 02Cooking load, equipment and building-constraint review
  • 03Route, riser and termination feasibility
  • 04Scope confirmation for hoods, fans and connections

C1 — Design & installation process

  • 01Exhaust duct layout and design to the assessed load
  • 02Ductwork fabrication to the agreed specification
  • 03Installation of duct runs, hoods and exhaust fans where scoped
  • 04Connections to existing equipment and terminations
  • 05Agreed commissioning checks before handover

C2 — Technology & equipment

  • 01Sheet-metal duct fabrication to specification
  • 02Exhaust hoods and baffle/filter arrangements where scoped
  • 03Exhaust fans matched to the designed airflow
  • 04Supports, hangers and access provisions built into the design

C3 — Site protection & safety

  • 01Work areas isolated and signposted during installation
  • 02Hot-work and overhead work under permit and supervision
  • 03Existing kitchen equipment protected during retrofit work
  • 04Site handed back clean and service-ready at completion
D

Verification & handover

Handover, documented.

Every kitchen exhaust system design, fabrication & installation project closes against the agreed scope: drawings and specifications on record, an installation checklist, project photographs and agreed testing records, handed over with completion documentation.

The deliverables you receive at handover

  • Approved scope and drawings
  • Material / specification records
  • Installation checklist
  • Project photographs
  • Agreed testing records
  • Completion and handover documentation
G

FAQs

Asked by facility teams.

The first step costs nothing

SEE YOUR SYSTEM.THEN DECIDE.

A DCC survey inspects the system, grades the condition with photographs, and tells you what the evidence supports. Scope follows evidence — never the other way around.

Survey → Plan → Execute → Verify → Handover